Week 18
A few meetings, getting some schematics sorted and some time on Project M. I spend some time moving my chunking upload code to a new semi-permanent host.
Brought a sit-stand desk for the home office. it’s taking a bit of getting used to but I think it’ll be good for me long term.
My chromebook can do 4k DCI and UHD outputs, but not at 60hz – I guess it’s HDMI 1.4.
Week 19
So this week I’ve been at ShopTalk Europe as HoD video for the main stage.
Had some deliveries – Some 40GbE cards for a project 😉 With the usual MTU iPerf 1Gb usually tops out at about 940Mb/s, 10G at 9.3Gb/s and 40G at 37.5Gb/s (with -P 4). Using iPerf 2 and my script that i’ve published previously. Have some updates to make it a bit more stable also.
Interestingly the 10 year old CPU could push alot more if I needed it too.
Also accidentally found people actually referencing my script…. and someone complained that is was only for 10 seconds. OK fine – I’ll add some more args for threads, time and MTU. Version 2 now exists.
Week 20
Spending most of this week in Manchester building LED walls, and vMixing. Here’s one/four behind me floating in the air;
Finished off the week with a small video on how to have looping sections within a powerpoint deck.
Week 21
This week I started off with a day of coding for project M, adding a cloning feature and a few other small code improvements.
And then on site running video switch, graphics, and timer for a less complex gig.
Week 22
This week I was away – so not alot to say.
Had a issue on my iPerf script – so did a GIT Pull merge commit thingy to fix it.
Took a delivery of another couple dual 40Gb NICs and some more single 10Gb NICs, all fun and games/work.